Compeleted Projects


Sr.No. Project Name Project Status City State
Four laning of Pararia to Mohania section of NH-319(Old NH-30)from KM 54+530 to Km 11+330(Design chainage) in the state of Bihar under Bharatmala Pariyojana phase-I on EPC Mode (Package II)
Completed Pararia to Mohania Bihar
Construction of 4- Lane ROB and its approaches at KM 14+ 800 (Jerai) on NH-26A in lieu of exeisting level crossing No. 19 on Kanti -Bina section railway
Completed Jerai MadhyaPradesh
Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length: 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-I
Completed Kailashar Tripura
Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length: 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II
Completed Kailashar Tripura
Four laning of Arrah to Pararia section of NH-319(Old NH-30)from KM 0+000 to Km 54+530(Design chainage) in the state of Bihar under Bharatmala Pariyojana phase-I on EPC Mode (Package I)
Completed Arrah to Pararia Bihar
Construction of Extra-dosed /Cable Stayed RCC Brfidge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8in the State of Tripura on EPC mode.
Completed Sabroom Tripura
Construction of four lane flyover including RE Wall,Service lane,at grade road and improvement of Junctions at KM.2.500 On NH-24A on EPC Mode in the state of Uttar-Pradesh
Completed Lucknow Uttar Pradesh
Four Laning of Parwanoo- Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139 on EPC mode Under NHDP Phase-III in the state of Himachal Pradesh
Completed Solan Himanchal Pradesh
Development of 4-Lane Islampur Bypass of 10.310 Km. Length from Km. 0+000 (Ex Ch. Km. 498+500) to Km. 10+310 (Ex Ch. Km. 506+950) in the State of West Bengal Under NHDP Phase-II on EPC Mode - Three Magor Bridges
Completed Islampur West Bengal
Design engineering, procurement, construction and completion of 02 flyovers and 01 major bridge on EPC basic in Ankapalli Annavaram section (From 741 + 255 to km 830+525) of NH-5 (New NH-16)in the state of A.P
Completed Ankapalli Andhra Pradesh
Design and Construction of 1000 M Long Multi Span PMT PSC Box Grider Bridge
(Using Segmental Precast Concrete Box Girder Configuration) including SSI over
UJH Nallah at Km 4.170 on road Parole-koreponnu- Rajpura Under Project
SAMPARK in J&K State
Completed Kathua Jammu and Kashmir
Construction of 4 ROB in km. 161 (Ajabpur) on NH-72 (New No. 07) in Dehradun in the state of Uttarakhand” on Engineering, Procurement & Construction (EPC) Mode.
Completed Dehradun Uttarakhand
(Design and Construction of Flyover (In km341.100 to 343.000)
at Rajnandgaon in the State of Chhattisgarh)
Completed Rajnandgaon Chhattisgarh
Construction of 110M long double lane bow string steel girder bridge over
Ganga canal near Dhobi Ghat Laltaroa in Haridwar
Completed Haridwar Uttarakhand
Construction of 90M long 1.5 lane bow string steel girder bridge over Ganga
canal at down streem of Railway Bridge (Lal Pur) Jwalapur in Haridwar
Completed Haridwar Uttarakhand
Development of Greenfield Highway from Baktiarpur to Tajpur in Bihar on BOT basis ( 50 Km ) Completed Baktiarpur to Tajpur Bihar
Corridor Improvement From Azadpur To Mukerba Chowk in Delhi Completed Azadpur To Mukerba Chowk
Cable Stayed Bridge across Yamuna at Delhi Completed Yamuna at Delhi Delhi
Detailed Design of Flyover and its approaches at Rani Jhansi Marg, New Delhi Completed Rani Jhasi Marg New Delhi
Approaches To Bridge Across Ganga At Arrah And Chapra Completed Ganga At Arrah And Chapra Arrah And Chapra
Detailed Engineering Services for 6 laning of Dankuni to Kharagpur section of NH-6 Completed Dankuni to Kharagpur Section of NH-6 Dankuni toKharagpur
Detailed Design of Flyover and its approaches at Rani Jhansi Marg, New Delhi Completed Rani Jhasi Marg New Delhi
Approaches To Bridge Across Ganga At Arrah And Chapra Completed Ganga At Arrah And Chapra Arrah And Chapra
Detailed Engineering Services for 6 laning of Dankuni to Kharagpur section of NH-6 Completed Dankuni to Kharagpur Section of NH-6 Dankuni toKharagpur
Design of Cable stayed bridge at Basohli Completed Cable stayed bridge Basohli Basohli
Detailed Engineering for Developmant of Greenfield Highways connecting NH-31 near Bakhtiyarpur & NH-28 at Tajpur in the state of Bihar on DBFOT (Toll) Basis Completed NH-31 near Bakhtiarpur & NH-28 at Tajpur Bakhtiarpur to Tajpur
4 Laning of Quazigund-Banihal Section of NM-1A in J&K on Annuity basis Completed NH-1A in Jammu & Kashmir Quazigund-Banihal
Detailed Engineering for Developmant of Greenfield Highways connecting NH-31 near Bakhtiyarpur & NH-28 at Tajpur in the state of Bihar on DBFOT (Toll) Basis Completed NH-31 near Bakhtiarpur & NH-28 at Tajpur Bakhtiarpur to Tajpur
4 Laning of Quazigund-Banihal Section of NM-1A in J&K on Annuity basis Completed NH-1A in Jammu & Kashmir Quazigund-Banihal
Design & Construction of Elevated Viaduct (415m) Connecting Badli Depot on Jahangirpuri – Badli Corridor (Extension of Line 2) of Delhi MRTS Phase – III, Contract no. CC-63 Completed Delhi Delhi
Design of Interchange at Km 48 on Yamuna Expressway Completed Uttar Pradesh. Yamuna Expressway, Greater NOIDA, U.P
Design of Bridge across River Ganga at Arrah -Chapra Completed Bihar Arrah -Chapra
Design of High Level Bridge across River Koshi at Vijay Ghat in Bihar Completed Bihar Vijay Ghat
Design of High Level Bridge across River Koshi at Saharsa District in Bihar Completed Bihar Saharsa District
Detailed Design of Interchange at km. 36 on Yamuna Expressway Completed Uttar Pradesh Yamuna Expressway
Detailed Design of Bridges across river Mahanadi & Kathajodi Completed Odisha Cuttack
Detailed Design of Interchange at km. 110 on Yamuna Expressway Completed Uttar Pradesh Mathura
Design of Cable stayed bridge at Basohli (Jammu & Kashmir) Completed (Jammu & Kashmir) Basohli
Detailed Design of Bridges across River Rupnarayan Completed West Bengal Kolaghat
Detailed Design of Incomplete Bridges across River Rupnarayan Completed West Bengal Rupnarayan
Detailed Design of Major Bridge across River Kanhan in Maharashtra Completed Maharashtra River Kanhan
Detailed Design of Major Bridge at km. 29+297 on Yamuna Expressway Completed Uttar Pradesh Yamuna Expressway
Detailed Engineering services for 6 laning of Dankuni to Kharagpur section of NH-6 Completed Kharagpur Dankuni
Four laning of Quazigund-Banihal Section of NH-1A in J&K on Annuity basis Completed NH-1A in J&K Jammu & Kashmir