|
Four laning of Pararia to Mohania section of NH-319(Old NH-30)from KM 54+530 to Km 11+330(Design chainage) in the state of Bihar under Bharatmala Pariyojana phase-I on EPC Mode (Package II)
| Completed |
Pararia to Mohania |
Bihar |
|
Construction of 4- Lane ROB and its approaches at KM 14+ 800 (Jerai) on NH-26A in lieu of exeisting level crossing No. 19 on Kanti -Bina section railway
| Completed |
Jerai |
MadhyaPradesh |
|
Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length: 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-I
| Completed |
Kailashar |
Tripura |
|
Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length: 11.800 km) of Kailashahar – Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II
| Completed |
Kailashar |
Tripura |
|
Four laning of Arrah to Pararia section of NH-319(Old NH-30)from KM 0+000 to Km 54+530(Design chainage) in the state of Bihar under Bharatmala Pariyojana phase-I on EPC Mode (Package I)
| Completed |
Arrah to Pararia |
Bihar |
|
Construction of Extra-dosed /Cable Stayed RCC Brfidge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8in the State of Tripura on EPC mode.
| Completed |
Sabroom |
Tripura |
|
Construction of four lane flyover including RE Wall,Service lane,at grade road and improvement of Junctions at KM.2.500 On NH-24A on EPC Mode in the state of Uttar-Pradesh
| Completed |
Lucknow |
Uttar Pradesh |
|
Four Laning of Parwanoo- Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139 on EPC mode Under NHDP Phase-III in the state of Himachal Pradesh
| Completed |
Solan |
Himanchal Pradesh |
|
Development of 4-Lane Islampur Bypass of 10.310 Km. Length from Km. 0+000 (Ex Ch. Km. 498+500) to Km. 10+310 (Ex Ch. Km. 506+950) in the State of West Bengal Under NHDP Phase-II on EPC Mode - Three Magor Bridges
| Completed |
Islampur |
West Bengal |
|
Design engineering, procurement, construction and completion of 02 flyovers and 01 major bridge on EPC basic in Ankapalli Annavaram section (From 741 + 255 to km 830+525) of NH-5 (New NH-16)in the state of A.P
| Completed |
Ankapalli |
Andhra Pradesh |
|
Design and Construction of 1000 M Long Multi Span PMT PSC Box Grider Bridge
(Using Segmental Precast Concrete Box Girder Configuration) including SSI over
UJH Nallah at Km 4.170 on road Parole-koreponnu- Rajpura Under Project
SAMPARK in J&K State |
Completed |
Kathua |
Jammu and Kashmir |
|
Construction of 4 ROB in km. 161 (Ajabpur) on NH-72 (New No. 07) in Dehradun in the state of Uttarakhand” on Engineering, Procurement & Construction (EPC) Mode.
| Completed |
Dehradun |
Uttarakhand |
|
(Design and Construction of Flyover (In km341.100 to 343.000)
at Rajnandgaon in the State of Chhattisgarh)
| Completed |
Rajnandgaon |
Chhattisgarh |
|
Construction of 110M long double lane bow string steel girder bridge over
Ganga canal near Dhobi Ghat Laltaroa in Haridwar |
Completed |
Haridwar |
Uttarakhand |
|
Construction of 90M long 1.5 lane bow string steel girder bridge over Ganga
canal at down streem of Railway Bridge (Lal Pur) Jwalapur in Haridwar |
Completed |
Haridwar |
Uttarakhand |
|
Development of Greenfield Highway from Baktiarpur to Tajpur in Bihar on BOT basis ( 50 Km ) |
Completed |
Baktiarpur to Tajpur |
Bihar |
|
Corridor Improvement From Azadpur To Mukerba Chowk in Delhi |
Completed |
Azadpur To Mukerba Chowk |
|
|
Cable Stayed Bridge across Yamuna at Delhi |
Completed |
Yamuna at Delhi |
Delhi |
|
Detailed Design of Flyover and its approaches at Rani Jhansi Marg, New Delhi |
Completed |
Rani Jhasi Marg |
New Delhi |
|
Approaches To Bridge Across Ganga At Arrah And Chapra |
Completed |
Ganga At Arrah And Chapra |
Arrah And Chapra |
|
Detailed Engineering Services for 6 laning of Dankuni to Kharagpur section of NH-6 |
Completed |
Dankuni to Kharagpur Section of NH-6 |
Dankuni toKharagpur |
|
Detailed Design of Flyover and its approaches at Rani Jhansi Marg, New Delhi |
Completed |
Rani Jhasi Marg |
New Delhi |
|
Approaches To Bridge Across Ganga At Arrah And Chapra |
Completed |
Ganga At Arrah And Chapra |
Arrah And Chapra |
|
Detailed Engineering Services for 6 laning of Dankuni to Kharagpur section of NH-6 |
Completed |
Dankuni to Kharagpur Section of NH-6 |
Dankuni toKharagpur |
|
Design of Cable stayed bridge at Basohli |
Completed |
Cable stayed bridge Basohli |
Basohli |
|
Detailed Engineering for Developmant of Greenfield Highways connecting NH-31 near Bakhtiyarpur & NH-28 at Tajpur in the state of Bihar on DBFOT (Toll) Basis |
Completed |
NH-31 near Bakhtiarpur & NH-28 at Tajpur |
Bakhtiarpur to Tajpur |
|
4 Laning of Quazigund-Banihal Section of NM-1A in J&K on Annuity basis |
Completed |
NH-1A in Jammu & Kashmir |
Quazigund-Banihal |
|
Detailed Engineering for Developmant of Greenfield Highways connecting NH-31 near Bakhtiyarpur & NH-28 at Tajpur in the state of Bihar on DBFOT (Toll) Basis |
Completed |
NH-31 near Bakhtiarpur & NH-28 at Tajpur |
Bakhtiarpur to Tajpur |
|
4 Laning of Quazigund-Banihal Section of NM-1A in J&K on Annuity basis |
Completed |
NH-1A in Jammu & Kashmir |
Quazigund-Banihal |
|
Design & Construction of Elevated Viaduct (415m) Connecting Badli Depot on Jahangirpuri – Badli Corridor (Extension of Line 2) of Delhi MRTS Phase – III, Contract no. CC-63 |
Completed |
Delhi |
Delhi |
|
Design of Interchange at Km 48 on Yamuna Expressway |
Completed |
Uttar Pradesh. |
Yamuna Expressway, Greater NOIDA, U.P |
|
Design of Bridge across River Ganga at Arrah -Chapra |
Completed |
Bihar |
Arrah -Chapra |
|
Design of High Level Bridge across River Koshi at Vijay Ghat in Bihar |
Completed |
Bihar |
Vijay Ghat |
|
Design of High Level Bridge across River Koshi at Saharsa District in Bihar |
Completed |
Bihar |
Saharsa District |
|
Detailed Design of Interchange at km. 36 on Yamuna Expressway |
Completed |
Uttar Pradesh |
Yamuna Expressway |
|
Detailed Design of Bridges across river Mahanadi & Kathajodi |
Completed |
Odisha |
Cuttack |
|
Detailed Design of Interchange at km. 110 on Yamuna Expressway |
Completed |
Uttar Pradesh |
Mathura |
|
Design of Cable stayed bridge at Basohli (Jammu & Kashmir) |
Completed |
(Jammu & Kashmir) |
Basohli |
|
Detailed Design of Bridges across River Rupnarayan |
Completed |
West Bengal |
Kolaghat |
|
Detailed Design of Incomplete Bridges across River Rupnarayan |
Completed |
West Bengal |
Rupnarayan |
|
Detailed Design of Major Bridge across River Kanhan in Maharashtra |
Completed |
Maharashtra |
River Kanhan |
|
Detailed Design of Major Bridge at km. 29+297 on Yamuna Expressway |
Completed |
Uttar Pradesh |
Yamuna Expressway |
|
Detailed Engineering services for 6 laning of Dankuni to Kharagpur section of NH-6 |
Completed |
Kharagpur |
Dankuni |
|
Four laning of Quazigund-Banihal Section of NH-1A in J&K on Annuity basis |
Completed |
NH-1A in J&K |
Jammu & Kashmir |