Construction Project


Sr.No. Project Name Project Status Project Location City
Construction of Extra-dosed /Cable Stayed RCC Brfidge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8in the State of Tripura on EPC mode.
Ongoing Project Sabroom Tripura
Four Laning of Parwanoo- Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139 on EPC mode Under NHDP Phase-III in the state of Himachal Pradesh
Ongoing Project Solan Himanchal Pradesh
Development of 4-Lane Islampur Bypass of 10.310 Km. Length from Km. 0+000 (Ex Ch. Km. 498+500) to Km. 10+310 (Ex Ch. Km. 506+950) in the State of West Bengal Under NHDP Phase-II on EPC Mode - Three Magor Bridges
Ongoing Project Islampur West Bengal
Construction of four lane flyover including RE Wall,Service lane,at grade road and improvement of Junctions at KM.2.500 On NH-24A on EPC Mode in the state of Uttar-Pradesh
Ongoing Project Lucknow Uttar Pradesh
Design engineering, procurement, construction and completion of 02 flyovers and 01 major bridge on EPC basic in Ankapalli Annavaram section (From 741 + 255 to km 830+525) of NH-5 (New NH-16)in the state of A.P
Ongoing Project Ankapalli Andhra Pradesh
CONSTRUCTION OF TWO LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING (L.C. NO. 77C) AT KM. 24 ON NH-327A ON EPC MODE IN THE STATE OF BIHAR. (JOB NO. NH-327A-BR-201S-19/11)
Ongoing Project Supaul Bihar

Recent Works


Bridge

Inauguration of Haridwar Bridge

View

Bridge

Inauguration of Haridwar Bridge

View

Bridge

Inauguration of Haridwar Bridge

View

Bridge

Inauguration of Haridwar Bridge

View